Current Works and Road Closures

Merrigang St works in 2014

This notification is for scheduled closures and works. It does not show emergency closures. 


Speed limits at work sites are enforceable and heavy fines apply. Please keep our staff and contractors safe and drive to posted limits and conditions.



linkClick here to view map of current works & outages



Water Supply & Sewerage Services


 LocationIssueDateNotes
Burradoo Rd, BurradooWater Main Shut Down8 June 2018

Water Main Shut Down


Crews are in attendance and will need to shut down the water main to complete the repair. Affected residents will be those between Nerang St & Moynoe Close and will include the cul-de-sac of Moynoe Close.

Duration: approximately 1hr. Customers may experience discolouration while the water is being reinstated. Council endeavours to repair the main and restore water as soon as possible to affected residents.

Devon Rd, ExeterWater Main Break8 June 2018Water Main Break

Crews are in attendance working to repair the broken water main.  Affected residents will be; No. 72, 81, 85, 86, 103, 106, 111, 126, 133, 140, 149, 150 & 158, 160. 
Estimated time of outage and repair is unknown at this stage.
St Denis Close BurradooWater Main Break7 June 2018Water Main Break.

Crews are in attendance working to repair the water main and restore water supply. Affected residents will be the surrounding properties within St Denis Close.


Estimated time of repair is unknown at this stage.

Links Road
Burradoo
Water Main Break7 June 2018Water Main Break.

Crews are in attendance working to repair the water main and restore water supply. Affected residents will be the surrounding properties along Links Road from Moss Vale Road intersection to 9 Links Road - including Campbell Avenue.

Estimated time of repair is unknown at this stage.
Wilson Drive, Hill TopPlanned Water OutageThurs 7th June 2018

Council will be shutting down the water main for repair, servicing Wilson Drive and Telopea Road areas between Colo Vale and Hill Top. The outage time will be from 9am to 4:30pm on Thursday 7th June. Affected customers have been notified via notification slips on 05/06/18.

Bowral Sewage Treatment Plant, Burradoo Rd, Burradoo.

Increased truck movements and possible odour.

2 weeks from the 30th May 2018 to 8th June 2018.


Council is required to conduct a maintenance program at monthly intervals to ensure best operational practices and regulatory compliance. Although Council implements managerial protocols during this process, unfortunately the practice may still result in residents noticing odour release. These scheduled works are impacted by wet weather and operational demands. There will also be increased truck movements during this time.

Bowral,
Bundanoon,
Burradoo,
Colo Vale,
Exeter,
Mittagong,
Moss Vale & Welby


Sewer manhole survey and condition assessment programCommencing 21st May 2018 due for completion by end of June 2018

Council has engaged FITT Resources to undertake sewer manhole surveys and condition assessments.


FITT resources will be starting works on 21st May 2018. Notification letters will be delivered to affected residents prior to works starting. 


The project involves:

  • Access to Council's sewer manholes (access chambers) to survey location (x,y coordinates) and depth (elevation)
  • Inspection of the manholes to assess the condition and identify defects
  • Traffic control where required.

The project is due for completion by end of June 2018.

For further information contact Council's Project Manager, Tim Bell on phone 4868 0888.

Berrima, New Berrima and Moss ValeSewer main cleaning and cctv inspection program

Commencing early Feb 2018 due for completion by end of June 2018

Council has engaged Environmental Services Group (ESG) to undertake sewer pipe cleaning & CCTV inspections as part of its annual sewer maintenance program targeting inflow and infiltration into the sewer network. 


ESG will be starting works in early February. Notification letters will be delivered to affected residents prior to works starting in their area.


The project involves the following activities: 

• Accessing the sewer system via access chambers
• Cleaning of the sewer pipes
• CCTV Survey of the sewer pipes
• Traffic Control for the above activities where required.

The contract is due to be completed by end of June 2018.


For further information contact Council's Project Manager, Tim Bell on phone 4868 0888. 

Merrigang Street, Bowral

Sewer Main Construction

Commencing 17th Jan 2018

The works will involve laying a new trench along the roadway and the construction of a new 225mm sewer main by specialist contractor Carve Earthworks. Construction will be carried out over a distance of 350 metres between the intersections of Queen Street and Jasmine Street.


Hours of construction will be 7.00am to 6.00pm Mondays to Saturdays.


During these construction hours a lane of the immediate work area will be temporarily closed to through traffic. Detour will be in place through Jasmine Street for east bound traffic and Queen Street for west bound traffic.


The project is scheduled to be completed by mid-February 2018. All timeframes are subject to weather conditions.


For further information contact Council’s Project Engineer, Pranayan Giri on phone 4868 0888

Bowral,
Bundanoon,
Burradoo,
Colo Vale,
Exeter,
Mittagong,
Moss Vale & Welby
Water & Sewer Network Renewals & UpgradesTo be completed Feb 2019

As part of an ongoing water and sewer assets improvement program and to ensure a high quality, fully maintained reliable system , Council is planning to upgrade and renew essential water mains, water meters, sewer mains and manholes.


Council has engaged the contractor Carve Earthworks and Construction Pty Ltd to undertake these works and their staff will be carrying identification cards at all times.


Trenchless techniques will be used wherever possible to reduce the construction impacts; however the renewal works will require some excavation. Customers and business will be notified in advance of any works in their area which may impact them.


Regrettably due to the nature of the program minimal interruptions may occur to customer’s water and sewerage services, therefore contractor on behalf of Council will contact impacted residents in advance. Inevitably some residents may also experience localised noise and traffic disruptions during construction.


Areas affected by the works will be reinstated as close as possible to their original condition, including any grassed areas, roads, footpaths and driveways. All reasonable steps will be taken to minimise damage and restore land as soon as practicable to its pre-construction condition.


The extensive program of works will be located within the areas of Moss Vale, Bowral, Mittagong, Welby, Colo Vale, Willow Vale and Burradoo and is planned to be completed by February 2019.
All necessary WHS procedures and traffic controls will be in place and managed accordingly in the affected areas.
For any information or queries regarding this please call 4868 0888

Moss Vale, Lackey RoadWater Main ConstructionCommencing Monday 8th Jan 2018

The works will involve the renewing of the old water main and the construction of a new 150mm water main by specialist contractor Carve Earthworks. Construction will be carried out over a distance of 400 metres between the intersections of Parkes Road with Lackey Road and Argyle Street.


Hours of construction will be 7.00am to 6.00pm Mondays to Saturdays.

During these construction hours the immediate work area will be temporarily closed to through traffic. Access will however be made available to immediate properties Lackey Road.


Road users and pedestrians are cautioned to follow the changed traffic conditions including detours, exercise care when travelling through the construction zones and be aware of loose stones and heavy machinery within the work areas.

Signage will also be erected and traffic controllers will be stationed on site to manage traffic during work hours. Where possible, motorists are advised to avoid the area.


Council thanks motorists in advance for their cooperation and apologises for any temporary delays or inconvenience.


The project is scheduled to be completed by early February 2018. All timeframes are subject to weather conditions.

For further information contact Council’s Project Engineer, Pranayan Giri on phone 4868 0888




Current Infrastructure Closures


 LocationReason Date Notes 

Oldbury Road,   Sutton Forest

Flood water over road. Do not drive through or enter floodwater

Until further notice

Closed at: Approximately 1km north east of Golden Vale Road
Detours: Access to all properties on Oldbury Road is still available. Addresses South West of Medway Rivulet – access from Golden Vale Road. Addresses north east of Medway Rivulet – access from Illawarra Highway.

Vandenbergh Road, RobertsonFlooding DamageUntil further noticeClosure of section, due to erosion of the roadway and flooding. This will make a no through road, property access can be made from either end. 
Hamilton Avenue, BowralDrainage and Road Reconstruction13 March to June 2018Road closed, resident and service vehicle access only. Road users are cautioned to follow the changed traffic conditions, exercise care when travelling through the work zones and be aware of loose stones and heavy machinery within the work areas.

Albert Street, Mittagong

(between Victoria St and Alice St)
Footpath ConstructionUntil end of JuneFootpath closed. 
Residents to exercise care in the area. Traffic Control on site.
Intersection of Mary Street and Belmore Street, MittagongDrainage Works 
Stockpile area
28 May to August 2018.Road closed, service vehicle access only. 
Abattoir Road, Moss ValeDrainage Works4 June to 30 June 2018Traffic control will be in place, down to one lane. Road users are cautioned to follow the changed traffic conditions, exercise care when travelling through the work zones and be aware of loose stones and heavy machinery within the work areas.


Current Infrastructure Works


Location    Works 
Dates 
Notes 
Rose & Victoria Street BowralFlood Markers InstallationCompletion  by End of June 2018.
Continues throughout Bowral Township over coming 12 months. 

Wingecarribee Shire Council is set to install a series of flood depth markers and floodway warning signs at flooding hotspots in a bid to provide improved warning during high rainfall incidents when stormwater overtops a road.


The first of the new flood depth markers and flood warning signs will be erected during the month of June in Victoria and Rose Streets in Bowral.


Further signs will be installed across Bowral at known flooding locations over the next 12 months.


See PDF plans below for locations of markers for Rose and Victoria Street, Bowral and proposed markers (subject to survey) for the remainder of the Bowral township.


Installation of markers should not interrupt any pedestrian or vehicle access, but please take caution when works are underway.



PDFProposed flood markers - Bowral- Rose-and-Victoria-Streets


PDFProposed Flood Markers Bowral



Meryla Road Bridge

Bridge Works

Until approx December 2018

20km/hr speed restrictions
have been imposed on the
Meryla Road bridge over
Bundanoon Creek due to the condition of the bridge.
Investigation and planning is currently being undertaken
to repair the bridge. 

East Bowral Community Centre

Carpark Works

Carpark pavement works ongoing

Council is extending the existing carpark to provide additional parking at the East Bowral Community Centre. During construction sections of the carpark and footpath in the immediate vicinity of works may be temporarily closed to allow the movement of construction vehicles. The carpark will however remain open and efforts will be made to minimise the impact.
Please use caution and drive carefully.


Wilson Drive Rehabilitation, Hill Top. (Near 1363, 1388, 1339, 1321).Road ReconstructionEnd November 2017 to June 2018During construction, sections of the road may be temporarily reduced to one-way traffic however the road will remain open to immediate residents and through traffic.
Road users are cautioned to follow the changed traffic conditions, exercise care when traveling through the work zones and be aware of loose stones and heavy machinery within the work areas.

Cnr Church Road and Wilson Drive, Colo Vale

Rural Fire Service Building

Works expected to be complete in early 2018

Council is constructing a new building to house the NSW RFS. This new purpose built building will replace the existing structure at a more suitable central location. Minor local traffic disruptions are expected.

Garland Road, BundanoonDrainage Pits UpgradesJune 2018Roads will be under traffic control. Sections of roads may be reduced to one-way traffic however the road will remain open to immediate residents. Road users are cautioned to follow the changed traffic condition, exercise care when travelling through the work zone and be aware of loose stone and heavy machinery.
Old Mandemar Road, BerrimaDrainage RenewalJune 2018Roads will be under traffic control. Sections of roads may be reduced to one-way traffic however the road will remain open to immediate residents. Road users are cautioned to follow the changed traffic condition, exercise care when travelling through the work zone and be aware of loose stone and heavy machinery.

Near 1124 Penrose Road, Penrose

Drainage Works

June 2018

Roads will be under traffic control. Sections of roads may be reduced to one-way traffic however the road will remain open to immediate residents. Road users are cautioned to follow the changed traffic condition, exercise care when travelling through the work zone and be aware of loose stone and heavy machinery.


Liebmans Road, MedwayGravel ResheetJune 2018Roads will be under traffic control. Sections of roads may be reduced to one-way traffic however the road will remain open to immediate residents. Road users are cautioned to follow the changed traffic condition, exercise care when travelling through the work zone and be aware of loose stone and heavy machinery.

Mary Street, Belmore Street, Southwood Place, Blomfield Crescent, MittagongDrainage WorksJune 2018 to August 2018Roads will be under traffic control. Sections of roads may be reduced to one-way traffic however the road will remain open to immediate residents. Road users are cautioned to follow the changed traffic condition, exercise care when travelling through the work zone and be aware of loose stone and heavy machinery.
Various Streets Around Shire.


See map of current works & outages (above) for location details.

Tree Clearance PruningJune 2018


(Subject to Contractor availability and weather conditions permitting)

Various street trees will be pruned during this time.

Road users are cautioned to exercise care when travelling through the work zones.
Various Streets Around Shire.


See map of current works & outages (above) for location details.

Tree Removal Program in partnership with Endeavour EnergyJune 2018Endeavour Energy is implementing a Hazard Reduction Program to remove hazardous trees within the vicinity of the electrical network. The trees listed for removal are either dead, dying (due to age or decay) or unstable because of structural defects such as splits, cracks, detached branches or an excessive lean.

Council Officers have reviewed the list of trees associated with this Hazard Reduction Program. On review, Council Officers are satisfied the proposed tree removals are required to maintain a safe electricity network.

The Hazard Reduction Program will be implemented during the month of June 2018. If you have any further questions regarding this project, please contact Council’s Tree Management Team on
(02) 4868 0888.



Development Works


 Location Works Dates Notes
Hansen Street, BowralRoad Pavement Repairs12 Feb - 19 Feb 2018Half of the road will be closed whilst works are undertaken. Works are to be carried out under traffic control.
Young Rd between Narellan Rd & Robertson Rd, Narellan Rd between Young Rd & Fitzroy Rd, and Fitzroy Rd between Illawarra Hwy & Hill RdRoad and Kerb & Gutter Works associated with subdivisionsUntil further noticeRoads will be under traffic control. Sections of roads may be reduced to one-way traffic however the road will remain open to immediate residents. Road users are cautioned to follow the changed traffic condition, exercise care when travelling through the work zone and be aware of loose stone and heavy machinery.
Boardman Road, between Old South Road and David Wood Playing Fields, East BowralRetford Park Estate West subdivision is currently under constructionUntil further notice.Retford Park Estate West subdivision is currently under construction. Part of the approved works includes the construction of a new roundabout on Boardman Road to provide access to the new Estate.




Roads and Maritime Services (RMS) Road Works

 Queries can be directed to RMS on 13 22 13.


 Location Dates Works Notes
Macquarie Pass, Mount Murray.

Cross Street or Location: Mount Murray.



Tuesday 19 June 2018 and Wednesday 20 June 2018.

Expected completion: Wednesday 20 June. 


Essential MaintenanceRoad closure.

Estimated maximum delay: 10 minutes additional travel time.

Hume Highway & Illawarra Highway Junction


Cross Street or Location: Illawarra Highway overpass Hume Highway

Monday 18 June 2018 to Friday 22 June 2018.


Expected completion: Friday 20 July 2018.





Concrete Repairs / Works

Speed restrictions apply during working hours. Reduce speed, exercise caution.


MR260 - Old Hume Highway, Mittagong.

Cross Street or Location: Between Nattai Bridge and Railway Crescent. 
Monday 18 June 2018 to Friday 22 June 2018.


Night works.
19:00 to 05:00.


Expected completion: Saturday morning 16 June 2018.



Pavement Works Speed restrictions apply during working hours.
HW2 - Hume Highway, Aylmerton to Welby.

Cross Street or Location: Old Hume Highway Aylmerton to Welby Interchange.
Monday 18 June 2018 to Friday 22 June 2018.

Expected completion: Friday 22 June 2018.



Pavement WorksSpeed restrictions apply during working hours
HW25 - Illawarra Highway, Burrawang. 

Cross Street or Location: Wilsons Road.

Monday 18 June 2018 and Tuesday 19 June 2018.


Expected completion: Tuesday 19 June 2018.




Safety Barrier InstallationSpeed restrictions apply during working hours. 
HW2 - Hume Highway, Alpine.

Cross Street or Location: Church Ave.
Sunday 17 June 2018 to Tuesday night 19 June 2018.

Night works: 7:00pm to 5:00am.


Expected completion date: Wednesday morning 20 June.
Vegetation ControlSpeed restrictions apply during working hours. 





The NSW Transport Management Centre (TMC) monitors and manages the state road network 24 hours a day, 7 days a week.


Live Traffic updates and traveler information is available:


Call 131 700 to report an incident to the Traffic Management Centre. 

Please note: Water levels can change at short notice due to saturated ground and flash flooding. For flooding emergencies please contact the State Emergency Service on 131 500.


Last Updated: June 18th, 2018